As principal contractor, BR’s work included stripping out existing facilities, constructing new timber-framed training bays and partitions, installing structural steelwork, adapting floors and ceilings, and redecorating throughout. Alongside the plumbing, electrical and specialist bay installations, these works have created a space where apprentices can put theory into practice.